Supervision of Pilot Project Cycle Lane
Supervising the construction of cycle lanes involved several key steps to ensure the project meets safety, quality, and regulatory standards.
- Planning and Design Review:
- Design Approval: Before construction begins, the cycle lane shop drawings and templates were reviewed and approved by NCS.
- Pre-Construction Preparation:
- Site Assessment: Inspected the site for any pre-existing conditions that could affect construction, such as road conditions, utilities, or any potholes.
- Quality Assurance:
- Material Testing: Thermoplastic paint thickness and the used area were monitored
- Completion and Final Inspection:
- Final Review: Conduct a final inspection to ensure all aspects of the cycle lane are completed according to the design and standards.